Industrial
Toll Freight Forwarding NZ
Construction of 40,000m2 warehouse and parcels area with 6000m2 of A-grade office space over three-levels, including:
Enabling site (cut/fill 60,000m3)
Embedded rail running through the warehouse
Rail-to-road cross-dock
Suspended structural steel gantry walkway
Pacific Steel water treatment plant ($12 million)
Main arterial roadway upgrade ($10 million)
Macrennie Commercial Construction engaged through a novated Design and Build
Construction Details
Steltech steel portal frame to warehouse
“Combi Slab” concrete warehouse slabs
Long-run metal roofing and wall cladding
Low-height precast panel to warehouse breezeway with parallel docking
Vertical aluminium fins supported by decorative fascia PFC frame to office
Fully sprinklered building (warehouse, office, canopies)
Feature Altus Frontline aluminium windows, framed and supported with heavy steel plate
Heavy-duty concrete yards with embedded rail
Complex, heavy-industry water-treatment plant
This is a four-star Green Star project

Project Details
Client: Toll New Zealand
Timespan: 98 weeks (Incl design and consent)
Project Manager: RDT Pacific
Architect: Williams Architects
Value: NZ 90 million
Quantity Surveyor: BQH
Engineer: Day Consulting Ltd